- Vishakha Sadhwani
- Posts
- Kubernetes Deployment Strategies Explained
Kubernetes Deployment Strategies Explained
Use cases, trade-offs, and answers to real interview scenarios

Hi Inner Circle,
It’s been a while — I’ve missed writing to you all.
Today, I want to dive into a topic that’s incredibly important for anyone preparing for a DevOps, Cloud Engineer, or SRE interview: Kubernetes Deployment Strategies.
This isn’t just about passing interviews — it’s about running real-world systems in production (where the real test happen once you land the job).
When you need to update an application in Kubernetes, simply replacing containers can cause service interruptions, bugs in production, or complete outages.
A well-chosen deployment strategy helps you roll out updates in a safe, controlled, and testable way (and tests your ability to tackle tricky scenarios)
Why deployment strategies matter:
They minimize downtime and user impact during deployments.
Allow you to test new features on a limited subset of users.
Make it easier to roll back safely if something breaks in production.
In this breakdown, we’ll explore 6 key Kubernetes deployment strategies, their trade-offs, when to use them, and how to talk about them in scenario-based interviews.
1. Canary: The "Gradual Rollout"

What it is:
Deploy the new version (V2) to a small percentage of users, while the majority continues to use the stable version (V1). If everything looks good, the new version is gradually rolled out to more users.
When to use it:
When you're releasing an experimental feature or a critical infrastructure change and want to validate it in production with minimal risk.
Pros:
Limits impact if there’s a bug
Enables real-world A/B testing
Supports metrics-based validation
Cons:
Requires observability and traffic control mechanisms
Slightly more complex to manage
Interview Scenario:
You are deploying a new machine learning feature for product recommendations. You want to evaluate its performance in production without affecting the full user base. What deployment strategy would you choose, and why?
Answer: I would choose a Canary deployment. This would allow me to send a small percentage of real traffic to the new model and monitor its accuracy, latency, and user engagement. Based on those metrics, I can either roll forward gradually or roll back without affecting the majority of users.
2. Blue-Green: The "Big Switch"

What it is:
Deploy the new version (Green) alongside the current stable version (Blue). Once the Green environment is tested and ready, you switch all traffic to it at once.
When to use it:
When you require a zero-downtime deployment with a simple and fast rollback path.
Pros:
Zero downtime
Easy rollback by switching back
Clean separation between versions
Cons:
Requires duplicate infrastructure temporarily
Costlier in terms of resource usage
Interview Scenario:
Your company is planning to launch a major feature update at a specific time, and it must go live without any downtime. How would you ensure a reliable deployment?
Answer: I would use a Blue-Green deployment. I’d deploy the new version in parallel to the current version, run pre-release testing, and at launch time, switch all traffic to the Green environment. If issues arise, switching back to Blue ensures minimal disruption.
3. A/B Testing: The "Data-Driven Approach"

What it is:
Route subsets of traffic to two different versions (V1 and V2) based on user attributes such as ID, region, or device type. Used primarily to measure which version performs better.
When to use it:
When your goal is to test new features or UI changes on live users and collect usage data for comparison.
Pros:
Enables product validation through real data
Excellent for UI/UX or feature effectiveness testing
Cons:
Complex setup
Requires analytics infrastructure
Less useful for backend-only changes
Interview Scenario:
Your design team has proposed two different layouts for the onboarding screen. You want to determine which one improves user retention. What deployment method would support this experiment?
Answer: I would go with A/B Testing. It allows us to split traffic between the two layouts and monitor metrics like retention or completion rate. Based on the outcome, we can promote the better-performing version to full production.
4. Rolling Update: The "Smooth Transition"

What it is:
The default strategy in Kubernetes. It replaces old pods with new ones in batches, ensuring that some old pods stay available during the update.
When to use it:
For most production updates where zero downtime is important and there's no need for highly controlled traffic routing.
Pros:
No downtime
Gradual rollout
Simple rollback using Kubernetes deployment history
Cons:
Slower rollout
Requires backward compatibility between versions
Risk of issues if DB/schema changes aren’t handled properly
Interview Scenario:
You are updating a payments microservice in your production cluster and need to ensure there is no downtime, and it’s not resource expensive. What strategy would you recommend, and why?
Answer: I would use a Rolling Update. It ensures that at all times, a portion of the old pods remains active while new pods are rolled out. This allows continuous service availability with the ability to pause or rollback if needed.
5. Recreate: The "Wipe and Replace"

What it is:
All old pods are terminated before the new version is deployed. This means the application is unavailable during the transition.
When to use it:
In non-critical environments or for applications that can tolerate scheduled downtime.
Pros:
Simple and fast
Minimal resource use
Cons:
Downtime is unavoidable
Not suitable for production services
Interview Scenario:
You manage an internal dashboard used by your team. Updates are scheduled for off-hours, and short downtime is acceptable. Which deployment approach would be most efficient?
Answer: I would use the Recreate strategy. It is the simplest and most resource-efficient option for this scenario since downtime is acceptable during low-usage hours.
6. Shadow: The "Silent Test"

What it is:
Live traffic is duplicated to both V1 and V2, but users only receive responses from V1. It allows testing V2 under production load without any real user interaction.
When to use it:
For performance testing, architecture rewrites, or large changes where you want full confidence before going live.
Pros:
Real production load testing
Detects performance issues early
No user impact
Cons:
High resource usage
Complex to configure
Does not test user-facing behavior directly
Interview Scenario:
Your team has rewritten a legacy monolith into a microservices architecture. Before fully switching over, how can you validate the new system can handle production traffic?
Answer: I would use a Shadow Deployment to mirror traffic to the new system. This allows us to test under real conditions without affecting users. We can monitor performance, logs, and system behavior before deciding to cut over fully.
In Summary:
Knowing when and how to apply these Kubernetes deployment strategies isn’t just a technical skill — it’s critical to running stable, scalable systems and demonstrating real-world experience in interviews.
I hope this helped clarify a core DevOps (K8s) concept.
See you this Saturday for a SPECIAL deep dive — it's going to be a good boost for your learning journey.
— Vishakha